dont exists:templates/xt_GeNet/javascript/pwk.js

Installation team incl. lorry, tools, traveling expenses, board and lodging.

exkl. 19 % USt zzgl. Versandkosten

Lieferzeit Auf Anfrage

Installation team incl. lorry, tools, traveling expenses, board and lodging.

Installation team incl. lorry, tools, traveling expenses, board and lodging.

Included:

  • vertical installation of the mast
  • working time for installation team (supervisor, technicians, climbers)
  • traveling expenses, board and lodging
Not included:
  • providing and paying for interim storage
  • providing and paying for big machines like excavator, caterpillar, wheel loader, plate compactor, etc.
  • installing additional equipment or third-party equipment or other options not included in this quotation
The duration is only a non-binding estimation based on the experience at other projects. Bad weather conditions can increase the duration of the installation.
For additional days the daily rate will be charged.

If installation is conducted during the winter additional installation days should be taken into account due to the reduced time of daylight and cold weather.

Content

Ge:Net GmbH

Am Rollberg 1
D-38678 Clausthal-Zellerfeld


Telefon: +49 (0)5323 / 94 86 55
Telefax: +49 (0)5323 / 94 86 56

E-Mail: info(at)genetworld.com

Kontaktformular